Projects

Installation of Rubber Mixing pant for general tyre company, Karachi

Nordtec International was commissioned by pal Ethanol (pvt) LTD. To perform the complete works for mechanical erection of carbon dioxide mixing plant. The project also included the installation electrical and Instrumental for the carbon mixing plant and technical support for the Chinese commissioning tem.

  • More Details

    Contract type Mechanical and Electrical Erection location Karachi.
    Client general Tyre and Rubber Company of Pakistan.
    Completion Date FEBRUARY,2017

Installation of Biogas plant to produce 65,000 M3/Day of BIOGAS for PAK ETHANOL (PVT.) LTD

Nordtec international was awarded an epc turnkey contract for the installation of a biogas plant to produce 65,000 cubic meters per day of biogas.
Nordtec international carried out the complete undertaking in house including the complete engineering design, civil, mechanical, electrical and instrumental works. Commissioning of the plant was also carried out by nordtec international.

  • More Details

    • Contract Type: EPC Turnkey
    • Project Location: Matli, Badin
    • Client: Pak Ethanol (Pvt.) Ltd
    • Completion Date August, 2014

Erection Of Absorber (Fgd System) And Emergency Slurry Tank Of Lucky 1 X 660 Mw Coal Fired Power Project

Nordtec International Was Awarded A Contract Fot The Installation Of Fgd, Absorber Tower Having Dimensions 18.8 Meter Dia And 52 Meter Height, And An Emergency Slurry Tank For 1*660mw Lucky Coal Fired Power Project.

  • More Details

    • Contract Type Mechanical Erection
    • Location Lepp, Port Qasim
    • Client Lucky Power
    • Award Date Feb 2020

Design, Mechanical, Fabrication, Automation, And Commissioning Of 6 Deep Bed Filters For Daharki Sugar Mills

  • More Details

    • Contract Type: EPC Turnkey
    • Contract Duration 05 Months
    • Location Deharki, Sindh
    • Client Deharki Sugar Mills
    • Completion Date Oct, 2016

Refurbishment Of Light Tower Installed At Ssgc Lpg Port Qasim Jetty

Nordtec Internatiomal Was Awarded A Contract For Refurbishment Of Light Tower Installed Ta Ssgc Lpg Port Qasim Jetty. Work Included Dismantling Of Installed Structure Including Monkey Ladder, Platform, Electrical Light And Cable

  • More Details

    • Contract Type Mechanial Erection
    • Location Ssgc Lpg, Port Qasim Jetty
    • Client Ssgc Lpg.
    • Completion Date Oct, 2020

Storage Tank And Pressure Vessels Project

Nordtec International Has Undertaken Various Medium And Small Scale Storage Project For Itd Clients. From Small And Medium Scale Pressure Vessels To Large 15000 Ton Storage Tanks.

  • More Details

    • Location Matli, Badin
    • Completion Date Aug, 2017
    • Client: ADNOC

Establishment of Ethanol Distillery Line – II for Pak Ethanol (Pvt.) Ltd., Matli

Nordtec International was awarded a project for complete works regarding the establishment of Line II at Pak Ethanol (Pvt.) Ltd. The project consisted of complete Civil, Mechanical, Electrical, Instrumentation, Surface Preparation, and Commissioning Works for the establishment of distillery complex.

Main Molasses Storage (20,000 Ton) • Ethanol Distillation Unit to Process Sugarcane • Biogas Plant to produce Biogas using the Effluent Generated from the Distillery • High Pressure Boiler to generate Steam using Biogas Produced through the Biogas Plant • 4.4 MW Power plant using Steam Generated from the High Pressure Boiler

  • More Details

    • Contract Type EPC Turnkey Location Matli, Badin
    • Client Pak Ethanol (Pvt.) Ltd.
    • Completion Date March, 2018

Installation of High Pressure Boiler and 4.4 Megawatt Power Plant for Pak Ethanol (Pvt.) Ltd Line II Project.

Nordtec International was tasked with the complete Installation and Commissioning of a Power Plant consisting of a High Pressure Boiler and Steam Turbine to fulfill the requirements of the new Line-II Distillery Complex as well as the existing Pak Ethanol Distillery as well as the nearby polymer plant and Sugar Mill. A boiler with a generation capacity of 40 tons of steam per hour at 65 bar pressure was suggested to the client and approved for installation.

  • More Details

    • Contract Type EPC Turnkey Location Matli, Badin
    • Client Pak Ethanol (Pvt.) Ltd.
    • Completion Date December, 2018